At long last there is light at the end of the tunnel!
This week we have managed to get the electrics finished, the glass replaced with self-cleaning glass (though the kite mark is the same as before so I'm a bit sceptical) and we have a lockable door on the cloakroom (though the *&^%ing thing is broken).
We even have a window sill in the cloakroom as well.
They will, however, be coming back to fix the broken lock and fill in the door frame, though they can't do that until the tiler has been.
So we're basically now waiting on the tiler, plasterer and guy opposite to fit the radiator, and then we're something like.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment